Total Pageviews

Friday, 10 February 2012

Call Sheet

Monday 20th February: We will start filming in our media lesson at 10.50am, and we will film for 1 hour and a half. We can film our opening in college hours as our setting is in the college dance studio.

Tuesday 21st February: We will start filming at 2.40pm until 4.10pm and will hopefully be able to finish off the filming for our opening sequence.

If our filming is not finished by the end of Tuesday 21st we will continue filming in our lunchtimes during the college day. These time periods will be from 12.20-1.05pm.

Friday 24th February: We will hopefully start editing at 9am as we think we will have got all of our filming done by this time. We will then edit for 1hour and a half and start to create our sound for the opening using garage band.

First day of filming:
(Depending on availability of our main location) If the dance studio is not available, we will do the shorter shots such as the shot of the music box, the poster and the toilet mirror scene. But if it is available on this day, we will make sure we get all of our shots done in the dance studio which is the main part of our opening.

Second Day of filming:
If not done so already, we will do the shots of the music box, the poster and the toilet mirror scene. These shots are the joining shots which break up the scenes which are in the dance studio. These shots also build up the suspense and the set off enigmas that we want the viewers to wander about.




No comments:

Post a Comment